1. Quick and Easy Installation Process
The transition to solar energy can be overwhelming, but Blue Raven Solar ensures a smooth and straightforward process from start to finish. From the moment you decide to install photovoltaic (PV) solar panels on your roof, our team handles everything—from the initial consultation to energization.
At your consultation, you’ll review and discuss a custom solar design and proposal for your home. We’ll also verify that you’re a good candidate for solar energy. While we refine your design, a site surveyor will inspect your property to ensure it’s ready for solar. They will check for roof damage, meter capacity, and other potential issues. After the survey, our designers will create a final design and determine the best financing options. We handle all permit applications needed for installation, taking care of the legal details.
On installation day, our skilled technicians will prepare your roof, install the wiring, secure the racking, and place the panels. They will also connect the inverters. Most installations take 1-2 days, but timelines may vary depending on local regulations. Once complete, the crew will review the installation with you and clean up the site. Two inspections—by a city inspector and your utility provider—will follow. After approval, you can flip the switch and start using your solar energy system!
Once you are connected to the utility grid, sit back and enjoy the savings! Your solar panels will be creating clean energy for your home. We aim to have your custom rooftop solar panel system up and running within 1 to 2 months, far faster than the industry average of 2-6 months. We have highly trained solar installers who ensure your system is set up efficiently and effectively, so you can start saving money quickly.